Impacts of integration of wind generation on regulation and load following requirements of california power systems

Makarov, Yuri V., Loutan, Clyde, Ma, Jian, De Mello, Phillip and Lu, Shuai (2008). Impacts of integration of wind generation on regulation and load following requirements of california power systems. In: EEM 2008 : 5th International Conference on European Electricity Market. 2008 5th International Conference on the European Electricity Market, EEM, Lisbon, Portugal, (). 28 - 30 May 2008. doi:10.1109/EEM.2008.4579027


Author Makarov, Yuri V.
Loutan, Clyde
Ma, Jian
De Mello, Phillip
Lu, Shuai
Title of paper Impacts of integration of wind generation on regulation and load following requirements of california power systems
Conference name 2008 5th International Conference on the European Electricity Market, EEM
Conference location Lisbon, Portugal
Conference dates 28 - 30 May 2008
Proceedings title EEM 2008 : 5th International Conference on European Electricity Market
Place of Publication Piscataway, NJ United States
Publisher I E E E
Publication Year 2008
Year available 2008
Sub-type Fully published paper
DOI 10.1109/EEM.2008.4579027
Open Access Status Not yet assessed
ISBN 9781424417445
1424417449
9781424417438
424417430
Total pages 6
Language eng
Abstract/Summary This paper describes a methodology to evaluate the amount of required regulation and load following capability to maintain reliability in the CAISO Control Area. The methodology is based on a mathematical model of the CAISO's actual scheduling, real-time dispatch and regulation processes. The forecast load and wind power are stochastic quantities, represented by two series of minute by minute values: the load/wind-power average value and its standard deviation magnitude. The hour-ahead wind generation forecast was assumed to be a part of the future CAISO/Scheduling Coordinator (SC) scheduling system. CAISO actual 2006 data and simulated 2010 data are analyzed by season. Load following and regulation requirements, including the capacity, ramping, and duration requirements by operating hour within a season of 2006 and 2010 were analyzed simultaneously.
Subjects 1406 Marketing
2102 Curatorial and Related Studies
2208 Electrical and Electronic Engineering
Keyword Capacity
Load following
Load forecast
Ramp rates
Real time dispatch
Q-Index Code E1
Q-Index Status Provisional Code
Institutional Status UQ

Document type: Conference Paper
Sub-type: Fully published paper
Collection: School of Information Technology and Electrical Engineering Publications
 
Versions
Version Filter Type
Citation counts: Scopus Citation Count Cited 7 times in Scopus Article | Citations
Google Scholar Search Google Scholar
Created: Wed, 27 Nov 2013, 11:35:37 EST by System User on behalf of School of Information Technol and Elec Engineering