Schemes of exploitation in open pit mining

Arteaga, Felipe, Nehring, Micah, Knights, Peter and Camus, Juan (2014). Schemes of exploitation in open pit mining. In: Carsten Drebenstedt and Raj Singhal, Mine Planning and Equipment Selection: Proceedings of the 22nd MPES Conference. 22nd MPES Conference, Dresden, Germany, (1307-1323). 14–19 October 2013. doi:10.1007/978-3-319-02678-7_126

Attached Files (Some files may be inaccessible until you login with your UQ eSpace credentials)
Name Description MIMEType Size Downloads

Author Arteaga, Felipe
Nehring, Micah
Knights, Peter
Camus, Juan
Title of paper Schemes of exploitation in open pit mining
Conference name 22nd MPES Conference
Conference location Dresden, Germany
Conference dates 14–19 October 2013
Proceedings title Mine Planning and Equipment Selection: Proceedings of the 22nd MPES Conference
Place of Publication Cham, Switzerland
Publisher Springer International Publishing
Publication Year 2014
Sub-type Fully published paper
DOI 10.1007/978-3-319-02678-7_126
Open Access Status
ISBN 9783319026770
9783319026787
Editor Carsten Drebenstedt
Raj Singhal
Volume 2
Start page 1307
End page 1323
Total pages 17
Collection year 2015
Language eng
Abstract/Summary The exploitation of open pit deposits usually takes place through a series of mining phases, commonly known as pushbacks. In open pit metalliferous mining, each pushback considers the extraction of one or more benches simultaneously in a process where the core operational tasks include: drilling, blasting, loading and hauling. In large open pit mines, shovels and front end loaders may be used to carry out loading activities. The type and number of shovels are selected during the planning process and their productivity determines the mining rate of the benches, pushbacks and the mine. The space available for loading is part of the pushback design. This defines the shape and size of the benches where the equipment will be placed. A relevant stage in mine design is the definition of the location and sequence that loading equipment must follow to deplete the benches of each pushback. The deployment of loading equipment in the mine is commonly referred to the scheme of exploitation. This term is widely used in the mining industry but not frequently referenced in the literature. The objective of this paper is to explore the concept of the scheme of exploitation in open pit mining within the context of the strategic mine planning activity. In the first part, the concept is presented through examples where the pushback size is fixed and the number of shovel is changed. The second part includes a discussion of the motivations and constraints that the mine planner may consider in the design. Configurations with several shovels and benches in a same pushback represent a challenge for the scheme design mainly due to the limitation of space for loading. Mathematical and optimisation tools can be useful in these cases; however, the models have to be able to represent the real constraints that will affect the productivity of the shovels in the different levels. In general, aggressive and costly schemes are rarely used by mining companies that seek high performance levels and lower operating costs. However, the selection of an appropriate scheme of exploitation needs to be aligned with the principal objective of the mine planning activity, which is to: create value through the exploitation of a mineral resource.
Keyword Open pit mining
Mine planning
Mine design
Q-Index Code E1
Q-Index Status Confirmed Code
Institutional Status UQ

 
Versions
Version Filter Type
Citation counts: Google Scholar Search Google Scholar
Created: Fri, 14 Mar 2014, 15:20:42 EST by Alex Fitzgerald on behalf of School of Mechanical and Mining Engineering