List of Subject Classifications Records

Browse Results (52 results found)

Subscribe to the RSS feed for this result setSubscribe to the RSS feed for this result set

Page 1 of 2

Result Pages:    1 2  next › last »

 Browse by Research Fields, Courses and Disciplines The Research Fields, Courses and Disciplines (Australian Standard Research Classification) is published by the Australian Bureau of Statistics (ABS catalogue number 1297.0) 1998. ABS data is used with permission from the Australian Bureau of Statistics -> 230000 Mathematical Sciences -> 230100 Mathematics -> 230117 Operations Research :

No further child subject classifications could be found.
  Abstract Views File Downloads Thomson Reuters Web of Science Citation Count Scopus Citation Count Altmetric Score
De Boer, P. T., Kroese, D. P. and Rubinstein, R. Y. (2004) A fast cross-entropy method for estimating buffer overflows in queuing networks. Management Science, 50 7: 883-895. doi:10.1287/mnsc.1030.0139 142 25 13 Cited 20 times in Scopus20 0
Jack, N. and Murthy, D. N. P. (2007) A flexible extended warranty and related optimal strategies. Journal of The Operational Research Society, 58 12: 1612-1620. doi:10.1057/palgrave.jors.2602326 193   12 Cited 16 times in Scopus16 0
Xu, Zhao, Dong, Zhao Yang and Wong, Kit Po (2006) A hybrid planning method for transmission networks in a deregulated environment. IEEE Transactions on Power Systems, 21 2: 925-932. doi:10.1109/TPWRS.2006.873134 172 288 16 Cited 30 times in Scopus30 0
Lai, C. D., Xie, M. and Murthy, D. N. P. (2003) A modified Weibull distribution. Ieee Transactions On Reliability, 52 1: 33-37. doi:10.1109/TR.2002.805788 99   104 Cited 120 times in Scopus120 0
Tragantalerngsak, S., Holt, J. and Ronnqvist, M. (2000) An exact method for the two-echelon, single-source, capacitated facility location problem. European Journal of Operational Research, 123 3: 473-489. doi:10.1016/S0377-2217(99)00105-8 108   49 Cited 60 times in Scopus60 0
Tyron J. Venn (2008). Appendices G to L. In Socio-economic Evaluation of Indigenous Enterprise Development: The Case of Wik Forestry, Cape York Peninsula, Australia (pp. 509-544) Saarbrucken: VDM. 129 1100
Tyron J. Venn (2008). Appendix M: GAMS Programming Code for the Wik Forestry Goal Programming Model. In Socio-economic Evaluation of Indigenous Enterprise Development: The Case of Wik Forestry, Cape York Peninsula, Australia (pp. 545-592) Saarbrucken: VDM. 443 591
Tyron J. Venn (2008). Appendix N: Private performance of optimal timber utilisation policies for scenario 1. In Socio-economic Evaluation of Indigenous Enterprise Development: The Case of Wik Forestry, Cape York Peninsula, Australia (pp. 593-606) Saarbrucken: VDM. 59 31
Tyron J. Venn (2008). Appendix O: Private performance of optimal timber utilisation policies for scenario 2. In Socio-economic Evaluation of Indigenous Enterprise Development: The Case of Wik Forestry, Cape York Peninsula, Australia (pp. 607-620) Saarbrucken: VDM. 49 21
Tyron J. Venn (2008). Appendix P: Private performance of optimal timber utilisation policies for scenario 3. In Socio-economic Evaluation of Indigenous Enterprise Development: The Case of Wik Forestry, Cape York Peninsula, Australia (pp. 621-634) Saarbrucken: VDM. 55 21
Tyron J. Venn (2008). Appendix Q: Private performance of optimal timber utilisation policies for scenario 4. In Socio-economic Evaluation of Indigenous Enterprise Development: The Case of Wik Forestry, Cape York Peninsula, Australia (pp. 635-648) Saarbrucken: VDM. 47 18
Baloi, Cristian Augustus (2003). Applications of forecasting and optimisation in the Australian national electricity market PhD Thesis, School of Physical Sciences, The University of Queensland. 123 9
Kroese, D. P. and Hui, Kin-Ping (2007). Applications of the cross-entropy method in reliability. In Gregory Levitin (Ed.), Computational intelligence in reliability engineering. New metaheuristics, neural and fuzzy techniques in reliability (pp. 37-82) Berlin, Germany: Springer-Verlag. doi:10.1007/978-3-540-37372-8_3 53   Cited 2 times in Scopus2 0
Jack, N and Murthy, DNP (2001) A servicing strategy for items sold under warranty. Journal of The Operational Research Society, 52 11: 1284-1288. doi:10.1057/palgrave.jors.2601223 69   34 0
Lai, C. D., Xie, M. and Murthy, D. N. P. (2001). Bathtub-Shaped Failure Rate Life Distributions. In N. Balakrishnan and C. R. Rao (Ed.), Handbook of Statistics Vol. 20 - Advances in Reliability 20 ed. (pp. 69-104) Netherlands: Elsevier Science B.V.. 152  
Case Studies in Reliability and Maintenance. Edited by W. R. Blischke and D. N. P. Murthy USA and Canada: John Wiley & Sons, Inc, 2003. 41  
Jack, N, Murthy, DNP and Iskandar, BP (2003) Comments on "Maintenance policies with two-dimensional warranty". Reliability Engineering & System Safety, 82 1: 105-109. doi:10.1016/S0951-8320(03)00119-4 39   4 Cited 6 times in Scopus6 0
Clarkson, I.V.L. (2003) Deducing optimal receiver dwell times Edinburgh, South Australia: Defence Science and Technology Organisation 45  
Asmussen, S., Kroese, D. P. and Rubinstein, R. Y. (2004) Heavy Tails, Importance Sampling and Cross-Entropy. 575 470
Blischke, W. R. and Murthy, D. N. P. (2003). Introduction and Overview. In Wallace R. Blischke and D. N. Prabhakar Murthy (Ed.), Case Studies in Reliability and Maintenance (pp. 1-34) New Jersey, USA: John Wiley and Sons, Inc. 47  
Pongpech, J., Murthy, D. N. P. and Boondiskulchok, R. (2006) Maintenance Strategies for used equipment under lease. Journal of Quality in Maintenance Engineering, 12 1: 52-67. doi:10.1108/13552510610654538 87   Cited 23 times in Scopus23 0
Jiang, R., Murthy, D.N.P. and Ji, P. (2001) Models involving two inverse Weibull distributions. Reliability Engineering & System Safety, 73 1: 73-81. doi:10.1016/S0951-8320(01)00030-8 84   28 Cited 33 times in Scopus33 0
Sawada, K. and Wilson, R. J. (2006) Models of adding relations to an organization structure of a complete K-ary tree. European Journal Of Operational Research, 174 3: 1491-1500. doi:10.1016/j.ejor.2005.01.067 155   10 Cited 18 times in Scopus18 0
Jiang, R., Murthy, D. N. P. and Ji, P. (2001) n-fold Weibull multiplicative model. Reliability Engineering & System Safety, 74 2: 211-219. doi:10.1016/S0951-8320(01)00108-9 42   4 Cited 3 times in Scopus3 0
Belward, J. A. (2002). Numerical algorithms - enhancing presentation while maintaining rigour in introductory courses: A minimalist approach to course modernization. In: Proceedings of the Second International Conference on the Teaching of Mahtematics. 2nd International Conference on the Teaching of Mathematics, Hersonissos, Crete, Greece, (). 1-6 July, 2002. 45  
Pongpech, J. and Murthy, D. N. P. (2006) Optimal periodic preventive maintenance policy for leased equipment. Reliability Engineering & System Safety, 91 7: 772-777. doi:10.1016/j.ress.2005.07.005 49   30 Cited 41 times in Scopus41 0
Huang, H.Z., Liu, Z.J. and Murthy, DNP (2007) Optimal reliability, warranty and price for new products. Iie Transactions, 39 8: 819-827. doi:10.1080/07408170601091907 156   85 Cited 101 times in Scopus101 0
Whiten, W. J. and Marion, K. (2005). Optimising the relationship of electricity spot prices to input data. In: Graeme Wake, Proceedings of the 2005 Mathematics-in-Industry Study Group. MISG 2005, Massey University, Auckland, NZ, (73-101). 24-28 January, 2005. 35  
Proceedings of the 3rd Operations Research Conference (2000) . Edited by Kozan, E. and Beard, R. M.. 3rd Operations Research Conference of ASOR - Qld Branch, 2 June 2000, Brisbane, Queensland. 43  
Osteras, T., Murthy, D. N. P. and Rausand, M. (2006) Product performance and specification in new product development. Journal of Engineering Design, 17 2: 177-192. doi:10.1080/09544820500275735 83   14 Cited 18 times in Scopus18 0
Saroso, D.S. and Murthy, D. N. P. (2007) Product quality improvement. International Journal of Technology Management, 37 1-2: 29-49. doi:10.1504/IJTM.2007.011802 119   0 Cited 0 times in Scopus0 0
Saroso, Dana Santoso. (2003). Product quality improvement : a system approach , School of Engineering, The University of Queensland. 212 3
Murthy, D. N. P. (2006). Product warranty and reliability. In: Peter L. Hammer, International Conference of OR for Development, Chennai, India, (133-146). 27–30 December 2002. doi:10.1007/s10479-006-7377-y 86   13 Cited 22 times in Scopus22 0
Beard, R.M. (2001). Random Search as a Solution Procedure for Optimal Stochastic Control Problems. In: M. Nooriafshar, E. Kozan. and P. Wark, 4th Operations Research Conference, 20 April 2001. 4th Operations Research Conference, USQ Toowoomba, Queensland, Australia, (105-120). 20 April 2001. 27  
Iskandar, B. P. and Murthy, D. N. P. (2003). Repair-replace strategies for two-dimensional warranty policies. In: Mathematical and Computer Modelling. 1st Western Pacific/3rd Australia-Japan Workshop on Stochastic Models in Engineering, Technology and Management, Christchurch, N.Z., (1233-1241). September 1999. doi:10.1016/S0895-7177(03)00336-4 38   25 Cited 28 times in Scopus28 0
Baloi, C. A., Belward, J. A. and Bulmer, M. (2001). Short term forecast of the load demand in Victoria. In: F. Ghassemi, International Congress on Modelling and Simulation. MODSIM 2001, The Australian National University, Canberra, (1065-1070). 10-13 December, 2001. 54  
Kroese, D. P., Scheinhardt, W. R. W. and Taylor, P. J. (2004) Spectral properties of the tandem Jackson network, seen as a quasi-birth-and-death process. Annals of Applied Probability, 14 4: 2057-2089. doi:10.1214/105051604000000477 76 8 33 Cited 35 times in Scopus35 3
Murthy, D.N.P., Atrens, A. and Eccleston, J. A. (2002) Strategic maintenance management. Journal of Quality in Maintenance Engineering, 8 4: 287-305. doi:10.1108/13552510210448504 223   Cited 62 times in Scopus62 0
Murthy, D. N. P. and Blischke, W. R. (2000) Strategic warranty management: A life-cycle approach. IEEE Transactions on Engineering Management, 47 1: 40-54. doi:10.1109/17.820724 90   27 Cited 40 times in Scopus40 0
Jiang, R. and Murthy, D. N. P. (2003). Study of n-fold Weibull competing risk model. In: Mathematical and Computer Modelling. 1st Western Pacific/3rd Australia-Japan Workshop on Stochastic Models in Engineering, Technology and Management,, Christchurch, N.Z., (1259-1273). September 1999. doi:10.1016/S0895-7177(03)00339-X 114   8 Cited 9 times in Scopus9 0
Bulmer, M. (2002). Teaching and learning mathematics with virtual worlds. In: Proceedings of the Second International Conference on the Teaching of Mahtematics. 2nd International Conference on the Teaching of Mathematics, Hersonissos, Crete, Greece, (). 1-6 July, 2002. 58  
Clarkson, I. Vaughan L. (2003). The arithmetic of receiver scheduling for electronic support. In: D. Williamson, 2003 IEEE Aerospace Conference Proceedings. 2003 IEEE Aerospace Conference, Big Sky, Montana, (2049-2064). 8-15 March, 2003. doi:10.1109/AERO.2003.1235131 79   0 Cited 6 times in Scopus6 0
Baloi, C. A. (1999). Two days ahead forcasting of electricity demand. In: Erhan Kozan, From Theory to Real Life. The 15th National Conferenceof The Australian Society for Operations Research Inc., Gold Coast, (173-183). 4-7 July 1999. 24  
Murthy, D. N. Pra, Baik, Jaiwook, Wilson, Richard J. and Bulmer, Michael (2006). Two-Dimensional Failure Modeling. In Hoang Pham (Ed.), Handbook of Engineering (pp. 97-111) London: Springer-Verlag. 67  
Murthy, D. N. P. and Jack, N. (2009). Warranty and Maintenance. In Mohamed Ben-Daya, Jezdimir Knezevic, Salih O. Duffuaa, Abdul Raouf and Daoud Ait-Kadi (Ed.), Handbook on Maintenance Management and Engineering (pp. 461-476) London: Springer Verlag. 60  
Lyons, K. and Murthy, D. N. P. (2001). Warranty and Manufacturing. In M. A. Rahim and Mohamed Ben-Daya (Ed.), Integrated Models in Production Planning, Inventory, Quality and Maintenance (pp. 289-324) USA: Kluwer Academic Publishers. 23  
Hussain, A. Z. M. O. and Murthy, D. N. P. (2003). Warranty and optimal reliability improvement through product development. In: Mathematical And Computer Modelling:. 1st Western Pacific/3rd Australia-Japan Workshop on Stochastic Models in Engineering, Technology and Management, Christchurch, New Zealand, (1211-1217). 23-25 September, 2003. doi:10.1016/S0895-7177(03)00333-9 45   12 Cited 19 times in Scopus19 0
Djamaludin, I., Murthy, D.N.P. and Kim, C.S. (2001) Warranty and preventative maintenance. International Journal of Reliability, Quality and Safety Engineering, 8 2: 89-107. doi:10.1142/S0218539301000396 57   0
Murthy, D. N. P. and Djamaludin, I. (2001). Warranty and Quality. In M. A. Rahim and Mohamed Ben-Daya (Ed.), Integrated Models in Production Planning, Inventory, Quality and Maintenance (pp. 325-360) USA: Kluwer Academic Publishers. 42  
Murthy, D. N. P. and Blischke, W. R. (2001). Warranty and Reliability. In N. Balakrishnan and C. R. Rao (Ed.), Handbook of Statistics Vol. 20 - Advances in Reliability (pp. 541-583) Netherlands: Elsevier Science B.V.. 49  

Page 1 of 2

Result Pages:    1 2  next › last »