Browse by all authors Browse By Author ID - Topal, Erkan

Browse Results (26 results found)

Subscribe to the RSS feed for this result setSubscribe to the RSS feed for this result set

Refine

  Abstract Views File Downloads Thomson Reuters Web of Science Citation Count Scopus Citation Count Altmetric Score
Shafiee, S., Topal, E. and Nehring, M. (2009). Adjusted real option valuation to maximise mining project value – A case study using century mine. In: Project Evaluation 2009 [electronic resource] : proceedings : "moving forward in challenging times". Project Evaluation Conference 2009, Melbourne, Australia, (125-134). 21-22 April 2009. 424  
Shafiee, Shahriar and Topal, Erkan (2010) A long-term view of worldwide fossil fuel prices. Applied Energy, 87 3: 988-1000. doi:10.1016/j.apenergy.2009.09.012 115   17 Cited 25 times in Scopus25 0
Shafiee, Shahriar and Topal, Erkan (2008) An econometrics view of worldwide fossil fuel consumption and the role of US. Energy Policy, 36 2: 775-786. doi:10.1016/j.enpol.2007.11.002 205 2 16 Cited 26 times in Scopus26 0
Nehring, M., Topal, E. and Little, J. (2010) A new mathematical programming model for production schedule optimization in underground mining operations. Journal of the South African Institute of Mining and Metallurgy, 110 8: 437-446. 249 2 2 Cited 4 times in Scopus4
Little, J., Nehring, M. and Topal, E. (2008). A new mixed-integer programming model for mine production scheduling optimisation in sublevel stope mining. In: P. Knights and P. J. A. Lever, Proceedings of: 2008 Australian Mining Techology Conference. 2008 Australian Mining Techology Conference, Twin Waters, Sunshine Coast, QLD, (167-172). 16-18 September, 2008. 179  
Micah Nehring and Topal, E. (2009). A New Short-Term Production Scheduling and Machine Allocation Model Using Mixed Interger Programming for Application in Sublevel Stope Mining Operations. In: Peter Knights and Paul J.A. Lever, Proceedings of the 2009 Australian Mining Technology Conference. 2009 Australian Mining Technology Conference, Brisbane, Australia, (116-133). 27-28 October 2009. 119  
Shafiee, S. and Topal, E. (2008). Applied real option valuation in a conceptual mining project. In: P. Knights and P. J. A. Lever, Proceedings of: 2008 Australian Mining Techology Conference. 2008 Australian Mining Techology Conference, Twin Waters, Sunshine Coast, QLD, (173-187). 16-18 September, 2008. 274  
Topal, Erkan and Williams, David J. (2009). Development and validation of a waste rock dumping optimisation model. In: Securing the Future and 8th International Conference on Acid Rock Drainage - Conference Proceedings. Securing the Future and 8th International Conference on Acid Rock Drainage, Skelleftea, Sweden, (1-11). June 23 - 26, 2009. 433  
Williams, D.J., Topal, E., Zhang, N. and Scott, P.A. (2008). Development of a rock dump scheduling model using linear programming. In: Fourie, A., Proceedings of the First International Seminar on the Management of Rock Dumps, Stockpiles and Heap Leach Pads. Rock Dumps 2008, Perth, Western Australia, (129-137). 5-6 March 2008. 121  
Dight, P. M., Douglas, B., Henley, K., Lumley, G., McAree, P. R., Miller, D., Saydam, S., Topal, E., Wesseloo, J. and Williams, D. J. (2013). Developments in open cut mining. In W. J. Rankin (Ed.), Australasian mining and metallurgical operating practices 3rd ed. (pp. 47-80) Carlton, VIC, Australia: Australasian Institute of Mining and Metallurgy. 83 6
Topal, E. (2008) Early start and late start algorithms to improve the solution time for long-term underground mine production scheduling. South African Institute of Mining and Metallurgy, 108 2: 101-107. 107   1 Cited 19 times in Scopus19
Shafiee, S. and Topal, E. (2007). Econometric forecasting of energy coal prices. In: M. Hood, P. Knights and P. J. A. Lever, Proceedings of: the 2007 Australian Mining Technology Conference. 2007 Australian Mining Technology Conference, The Vines, Western Australia, (173-179). 2-4 October 2007. 116  
Shafiee, S., Nehring, M. and Topal, E. (2009). Estimating average total cost of open pit coal mines in Australia. In: Peter Knights and Paul Lever, Technology solutions for challenging financial times. 2009 Australian Mining Technology Conference, Brisbane QLD, (134-146). 27 - 28 October 2009. 251  
Topal, E. (2008) Evaluation of a mining project using discounted cash flow analysis, decision tree analysis, Monte Carlo simulations and real options using an example. International Journal of Mining and Mineral Engineering, 1 1: 62-76. 343  
Ayhan, M and Topal, E (2005) Excavation and support design of the Dicle-Kralkizi water tunnel: an overview. Tunnelling And Underground Space Technology, 20 1: 81-87. doi:10.1016/j.tust.2004.06.001 108   1 Cited 3 times in Scopus3 0
Topal, Erkan and Shafiee, Shahriar (2011). General overview for worldwide trend of fossil fuels. In Morena J. Acosta (Ed.), Advances in energy research (pp. 203-224) Hauppauge, NY, U.S.A.: Nova Science Publishers. 163  
Kuchta, M, Newman, A and Topal, E (2004) Implementing a production schedule at LKAB's Kiruna Mine. Interfaces, 34 2: 124-134. doi:10.1287/inte.1030.0059 91   15 Cited 22 times in Scopus22 0
Erten, Oktay, McAndrew, Lachlan, Kizil, Mehmet Siddik and Topal, Erkan (2014) Incorporating fine-scale ground-penetrating radar data into the mapping of lateral variability of a laterite-type bauxite horizon. Mining Technology, 124 1: 1-15. doi:10.1179/1743286314Y.0000000073 27   Cited 0 times in Scopus0 0
Shafiee, S. and Topal, E. (2008). Introducing a new model to forecast mineral commodity price. In: Saydam, S., First International Future Mining Conference & Exhibition 2008. First International Future Mining Conference & Exhibition 2008, Sydney Australia, (243-250). 19-21 November 2008. 178  
Nehring, M. and Topal, E. (2007). Mixed integer programming model for mine production scheduling of sublevel stoping operation. In: M. Hood, P. Knights and P. J. A. Lever, Proceedings of the 2007 Australian Mining Technology Conference. 2007 Australian Mining Technology Conference, The Vines, Western Australia, (136-149). 2-4 October 2007. 153  
Nehring, M. and Topal, E. (2007). Mixed integer programming model for mine production scheduling of sub-level stoping operations. In: Smart technologies for overcoming the skills shortage. 2007 Australian Mining Technology Conference, The Vines, Australia, (). 2th - 4th October, 2007. 89  
Topal, E and Ayhan, M (2005) New linear programming optimisation model for marble factory production. Industrial Diamond Review, 2: 19-+. 137   0 Cited 1 times in Scopus1
Nehring, M. and Topal, E. (2007). Production schedule optimisation in underground hard rock mining using mixed integer programming. In: Project Evaluation Conference 2007. Project Evaluation Conference 2007, Melbourne, Victoria, (169-175). 19-20 June 2007. 272   3 Cited 2 times in Scopus2
Kutcha, M., Newman, A. and Topal, E. (2003) Production scheduling at LKAB's Kiruna Mine using mixed-integer programming. Mining Engineering, 55 4: 35-40. 103   Cited 9 times in Scopus9
Little, Jade and Topal, Erkan (2011) Strategies to assist in obtaining an optimal solution for an underground mine planning problem using Mixed Integer Programming. International Journal of Mining and Mineral Engineering, 3 2: 152-172. doi:10.1504/IJMME.2011.042429 26   Cited 1 times in Scopus1 0
Shafiee, Shahriar and Topal, Erkan (2009) When will fossil fuel reserves be diminished?. Energy Policy, 37 1: 181-189. doi:10.1016/j.enpol.2008.08.016 561   133 Cited 191 times in Scopus191 11