Browse by all authors Browse By Author ID - Nehring, Micah

Browse Results (17 results found)

Subscribe to the RSS feed for this result setSubscribe to the RSS feed for this result set

Refine

  Abstract Views File Downloads Thomson Reuters Web of Science Citation Count Scopus Citation Count Altmetric Score
Smith, C. B., Nehring, M. and Bosompem, M. K. (2014) A critique of selective mining unit sizing at Century Mine to optimise productivity with dilution. Journal of Research Projects Review, 3 1: 63-68. 135 4
Shafiee, S., Topal, E. and Nehring, M. (2009). Adjusted real option valuation to maximise mining project value – A case study using century mine. In: Project Evaluation 2009 [electronic resource] : proceedings : "moving forward in challenging times". Project Evaluation Conference 2009, Melbourne, Australia, (125-134). 21-22 April 2009. 424  
Nehring, M., Topal, E. and Little, J. (2010) A new mathematical programming model for production schedule optimization in underground mining operations. Journal of the South African Institute of Mining and Metallurgy, 110 8: 437-446. 251 2 2 Cited 4 times in Scopus4
Little, J., Nehring, M. and Topal, E. (2008). A new mixed-integer programming model for mine production scheduling optimisation in sublevel stope mining. In: P. Knights and P. J. A. Lever, Proceedings of: 2008 Australian Mining Techology Conference. 2008 Australian Mining Techology Conference, Twin Waters, Sunshine Coast, QLD, (167-172). 16-18 September, 2008. 179  
Micah Nehring and Topal, E. (2009). A New Short-Term Production Scheduling and Machine Allocation Model Using Mixed Interger Programming for Application in Sublevel Stope Mining Operations. In: Peter Knights and Paul J.A. Lever, Proceedings of the 2009 Australian Mining Technology Conference. 2009 Australian Mining Technology Conference, Brisbane, Australia, (116-133). 27-28 October 2009. 119  
Nehring, M., Topal, E., Kizil, M. and Knights, P. (2010). An investigation to integrate optimum long-term planning with short planning in underground mine production scheduling. In: P. A. Dowd, Mine Planning and Equipment Selection – MPES 2010 Proceedings. MPES2010: Mine Planning and Equipment Selection, Freemantle, Western Australia, (141-153). 1-3 December, 2010. 146 13
Nehring, M., Topal, E. and Knights, P. (2010) Dynamic Short term production scheduling and machine allocation in underground mining using mathematical programming. Transactions of the Institute of Materials, Minerals and Mining, Section A: Mining Technology, 119 4: 212-220. doi:10.1179/1743286310Y.0000000001 156 7 Cited 4 times in Scopus4 0
Shafiee, S., Nehring, M. and Topal, E. (2009). Estimating average total cost of open pit coal mines in Australia. In: Peter Knights and Paul Lever, Technology solutions for challenging financial times. 2009 Australian Mining Technology Conference, Brisbane QLD, (134-146). 27 - 28 October 2009. 252  
Yap, A., Saconi, F., Nehring, M., Arteaga, F., Pinto, P., Asad, M. W. A., Ozhigin, S., Ozhigina, S., Mozer, D., Nagibin, A., Pul, E., Shvedov, D., Ozhigin, D., Gorokhov, D. and Karatayeva, V. (2013) Exploiting the metallurgical throughput-recovery relationship to optimise resource value as part of the production scheduling process. Minerals Engineering, 53 74-83. doi:10.1016/j.mineng.2013.06.005 53   0 Cited 0 times in Scopus0 0
Nehring, Micah (2011). Integrated Production Schedule Optimisation for Sublevel Stoping Mines PhD Thesis, School of Mechanical and Mining Engineering, The University of Queensland. 531 95
Nehring, M., Topal, E., Kizil, Mehmet S. and Knights, P. (2012) Integrated short- and medium-term underground mine production scheduling. Journal of The South African Institute of Mining and Metallurgy, 112 5: 365-378. 206 2 2 Cited 2 times in Scopus2
Nehring, M. and Topal, E. (2007). Mixed integer programming model for mine production scheduling of sublevel stoping operation. In: M. Hood, P. Knights and P. J. A. Lever, Proceedings of the 2007 Australian Mining Technology Conference. 2007 Australian Mining Technology Conference, The Vines, Western Australia, (136-149). 2-4 October 2007. 153  
Nehring, M. and Topal, E. (2007). Mixed integer programming model for mine production scheduling of sub-level stoping operations. In: Smart technologies for overcoming the skills shortage. 2007 Australian Mining Technology Conference, The Vines, Australia, (). 2th - 4th October, 2007. 89  
Salama, Abubakary, Nehring, Micah and Greberg, Jenny (2013) Operating value optimization using simulation and mixed integer programming. International Journal of Mining, Reclamation and Environment, 28 1: 25-46. doi:10.1080/17480930.2013.768019 42   0 Cited 0 times in Scopus0 0
Nehring, M. and Topal, E. (2007). Production schedule optimisation in underground hard rock mining using mixed integer programming. In: Project Evaluation Conference 2007. Project Evaluation Conference 2007, Melbourne, Victoria, (169-175). 19-20 June 2007. 272   3 Cited 2 times in Scopus2
Arteaga, Felipe, Nehring, Micah, Knights, Peter and Camus, Juan (2014). Schemes of exploitation in open pit mining. In: Carsten Drebenstedt and Raj Singhal, Mine Planning and Equipment Selection: Proceedings of the 22nd MPES Conference. 22nd MPES Conference, Dresden, Germany, (1307-1323). 14–19 October 2013. doi:10.1007/978-3-319-02678-7_126 80 6 0
Nehring, Micah (2006). Stope sequencing and optimisation in underground hardrock mining B.Sc Thesis, School of Engineering, The University of Queensland. 97 3