Browse by all authors Browse By Author ID - Knights, Peter

Browse Results (70 results found)

Subscribe to the RSS feed for this result setSubscribe to the RSS feed for this result set

Page 1 of 2

Result Pages:    1 2  next › last »

Refine

  Abstract Views File Downloads Thomson Reuters Web of Science Citation Count Scopus Citation Count Altmetric Score
Samaradivakara, GVI, Kizil, M and Knights, P (2009) A Cost Effective Method to Enhance Dredge Mine Reconciliation in Heavy Minerals Mining Industry. Marine Resources and Geotechnology, 27 4: 273-280. doi:10.1080/10641190903256934 167   0 Cited 0 times in Scopus0 0
Bassan, J., Srinivasan, V., Knights, P. and Farrelly, C. (2008). A day in the life of a mine worker 2025. In: Saydam, S., First International Future Mining Conference & Exhibition 2008. First International Future Mining Conference & Exhibition 2008, Sydney, Australia, (71-78). 19-21 November 2008. 268   2
Godoy, David R., Pascual, Rodrigo and Knights, Peter (2014) A decision-making framework to integrate maintenance contract conditions with critical spares management. Reliability Engineering and System Safety, 131 102-108. doi:10.1016/j.ress.2014.06.022 71   1 Cited 2 times in Scopus2 0
Lucas, T. and Knights, P. (2014) A maturity scale for indigenous employment in the Australian minerals industry. Journal of Research Projects Review, 3 1: 33-37. 44 7
Knights, B and Kizil, M.S (2012). An analysis of the SAFEMine Global Positioning System Collision Avoidance System. In Paul Hagan (Ed.), Mining education Australia: research projects review 2011 (pp. 23-29) Carton, VIC, Australia: The Australasian Institute of Mining and Metallurgy. 123 11
Valenzuela, P., Li, S. and Knights, P. (2007). An approach to map geotechnical uncertainty in Longwall Coal Operations. In: M. Hood, P. Knights and P. J. A. Lever, Proceedings of the 2007 Australian Mining Technology Conference. 2007 Australian Mining Technology Conference, The Vines, Western Australia, (183-192). 2-4 October, 2007. 121  
Nehring, M., Topal, E., Kizil, M. and Knights, P. (2010). An investigation to integrate optimum long-term planning with short planning in underground mine production scheduling. In: P. A. Dowd, Mine Planning and Equipment Selection – MPES 2010 Proceedings. MPES2010: Mine Planning and Equipment Selection, Freemantle, Western Australia, (141-153). 1-3 December, 2010. 156 13
Li, Shuxing and Knights, Peter (2009). Application of Real Options in short-term Mine Planning and Production scheduling. In: Knights, Peter and Lever, Paul J.A., Technology solutions for challenging financial times. Australian Mining Technology Conference, Brisbane Australia, (168-176). October 27-28 2009. 93  
Bassan, J. and Knights, P. (2008). Applications of advanced analytics in process plants: Safer, smarter, sustainable operations. In: Proceedings of AusIMM Metallurgical Plant Design and Operation Strategies. AusIMM Metallurgical Plant Design and Operation Strategies, Perth, Western Australia, (1-14). August 2008. 82  
Bastock, M., Flynn, B. and Knights, Peter (2009). Applying Modular Transporters to Relocate Large Hydraulic Excavators. In: The Iron Ore 2009 Conference, Perth, Western Australia, Australia, (). July 2009. 60  
Knights, Peter (2013). Are safe mines reliable mines?. In: Víctor Babarovich, Álvaro Endo, Rodrigo Pascual and Raúl Stegmaier, MAPLA 2013: Proceedings del 10º Encuentro Internacional de Mantenedores de Plantas Mineras. MAPLA 2013: 10º Encuentro Internacional de Mantenedores de Plantas, Santiago, Chile, (36-46). 4-6 September, 2013. 49 14
Knights, Peter (2013). Are safe mines reliable mines?. In: Víctor Babarovich, Álvaro Endo, Rodrigo Pascual and Raúl Stegmaier, MANTEMIN 2013: Proceedings del 8º Encuentro Internacional de Mantenedores de Equipos Mina. MANTEMIN 2013: 8º Encuentro Internacional de Mantenedores de Equipos Mina, Santiago, Chile, (34-44). 4-6 September, 2013. 53 9
Li, S., Valenzuela, P. and Knights, P. (2007). A risk management methodology for coal resources/reserves evaluation. In: M. Hood, P. Knights and P. J. A. Lever, Smart Technologies for Overcoming the Skills Shortage. 2007 Australian Mining Technology Conference, The Vines, Western Australia, (265-276). 2-4 October, 2007. 142  
Knights, P., Jullian, F. and Jofre, L. (2005). Assessing the Size of the Prize: Developing business cases for maintenance improvement projects. In: H. Gurgenci, M. Hood, P. Lever and P. Knights, Proceedings of the 2005 Australian Mining Technology Conference "new technologies to produce more with less. 2005 Australian Mining Technology Conference: New technologies to produce more with less, Freemantle, Western Australia, (151-164). 27-28 September 2005. 1400  
Shafiee, Shahriar and Knights, Peter (2009). Australian coal driving international development. In Peter Knights and Michael Hood (Ed.), Coal and the Commonwealth: The greatness of an Australian resource (pp. 77-99) [Brisbane, Qld.]: University of Queensland. 39  
Knights, Peter and Franklin, Dennis (2010). Autonomous surface mining equipment: is bigger better?. In: Paul Lever and Peter Knights, 2010 Australian Mining Technology Conference : "Technology changing the mining business footprint". 2010 Australian Mining Technology Conference, Perth, Western Australian, (1-8). 13-15 September 2010. 158 5
Stewart, P. C., Ramezanzadeh, A. and Knights, P. (2006). Benchmark drill and blast and mechanical excavation advance rates for underground hard-rock mine development. In: M. Hood, P. Lever and P. Knights, Value through cost control. 2006 Australian Mining Technology Conference, Hunter Valley, NSW, (41-63). 26-27 September 2006. 878  
Knights, P. F. and Oyanader, P. (2005) Best-in-class maintenance benchmarks in Chilean open pit mines. The CIM Bulletin, 98 1088: 93-93. 1034  
Knights, P., Jullian, F. and Jofre, L. (2006). Building business cases for maintenance improvement projects. In: International Mine Management Conference 2006. International Mine Management Conference 2006, Melbourne, Australia, (173-178). 16-18 October, 2006. 185  
Knights, P., Julian, F. and Jofre, L. (2006) Building business cases for maintenance improvement projects. AusIMM Bulletin, 6 November - December: 30-35. 66   Cited 0 times in Scopus0
Pascual, R, Del Castillo, G, Louit, D and Knights, P (2009) Business-oriented prioritization: A novel graphical technique. RELIABILITY ENGINEERING & SYSTEM SAFETY, 94 8: 1308-1313. doi:10.1016/j.ress.2009.01.013 59   4 Cited 8 times in Scopus8 0
Knights, P, Liang, X and Jessett, A (2013) Classifying dragline swing dependencies using coincident limit graphs.. Mining Technology, 122 1: 46-52. doi:10.1179/1743286312Y.0000000032 66 3 Cited 1 times in Scopus1 0
Knights, Peter and Hood, Michael (2010) Coal and the Commonwealth: The greatness of an Australian resource. AusIMM Bulletin, 1: 48-50. 106 125 Cited 0 times in Scopus0
Knights, P. and Hood, M. (2007). CRCMining: Un Modelo para la investigación colaborativa en la industria de minería. In G. Lagos (Ed.), Innovacion en mineria (pp. 181-192) Santiago, Chile: Ediciones universidad Catolica De Chile. 120  
Garcia, Jose, Juan Camus and Knights, Peter (2010). Creating competitive advantage in mining: An illustrative comparison with the oil industry. In: Raul Castro, Romke Kuyvenhoven and Xavier Emery, Proceedings of the 4th International Conference on Mining Innovation, MININ 2010. The Fourth International Conference on Mining Innovation, Santiago, Chile, (261-270). 23-25 June 2010. 363 216
Godoy, David, Pascual, Rodrigo and Knights, Peter (2011). Critical spare parts ordering decisions using conditional reliability and stochastic lead time. In: Victor Babarovich, Alvaro Endo, Rodrigo Pascual and Raul Stegmaier, Proceedings of the 8th International Mining Plant Maintenance Meeting (MAPLA 2011). 8th International Mining Plant Maintenance Meeting (MAPLA 2011), Antofagasta, Chile, (1-12). 7-9 September 2011. 197 11
Godoy, David R., Pascual, Rodrigo and Knights, Peter (2013) Critical spare parts ordering decisions using conditional reliability and stochastic lead time. Reliability Engineering and System Safety, 119 199-206. doi:10.1016/j.ress.2013.05.026 167   3 Cited 4 times in Scopus4 0
Liang, W., Zhu, Y. and Knights, P. (2012). Cultural challenges in Chinese/Australian mining mergers and acquisitions - a CEO's perspective. In: International Mine Management Conference 2012 Proceedings. International Mine Management Conference 2012, Melbourne, Australia, (251-260). 20-21 November 2012. 271 6
Knights, P. F., Louit, D. and Lay, A. (2004) Determining return on investment of maintenance projects using statistical cost modeling. Mining Engineering, 56 8: 33-39. 115   Cited 1 times in Scopus1
Knights, Peter (2011). Doing more with less: How to improve maintainance labour utilisation. In: Victor Babarovich, Alvaro Endo, Rodrigo Pascual and Raul Stegmaier, Proceedings of the 8th International Mining Plant Maintenance Meeting (MAPLA 2011). 8th International Mining Plant Maintenance Meeting (MAPLA 2011), Antofagasta, Chile, (1-9). 7-9 September 2011. 177 14
Knights, Peter F. (2006) Downtime priorities, Jack-knife diagrams and the business cycle. Maintenance and Asset Management, 19 4: 21-28. 1158  
Nehring, M., Topal, E. and Knights, P. (2010) Dynamic Short term production scheduling and machine allocation in underground mining using mathematical programming. Transactions of the Institute of Materials, Minerals and Mining, Section A: Mining Technology, 119 4: 212-220. doi:10.1179/1743286310Y.0000000001 164 7 Cited 4 times in Scopus4 0
Knights, P. (2008). Economic models for unscheduled downtime and loss of service. In: 11th International Conference of Maintenance Societies (ICOMS 2008). 11th International Conference of Maintenance Societies (ICOMS 2008), Perth, Western Australia, (1-14). 26-28 May 2008. 46  
Godoy, D., Pascual, R. and Knights, P. (2013). Esquema integrado de decisiones para el manejo de repuestos criticos en contratos de mantenimiento. In: Víctor Babarovich, Álvaro Endo, Rodrigo Pascual and Raúl Stegmaier, MAPLA 2013: Proceedings del 10º Encuentro Internacional de Mantenedores de Plantas Mineras. MAPLA 2013: 10º Encuentro Internacional de Mantenedores de Plantas, Santiago, Chile, (80-88). 4-6 September, 2013. 92 10
Li, Shu-xing, Knights, Peter and Dunn, Doug (2008) Geological uncertainty and risk: Implications for the viability of mining projects. Journal of Coal Science and Engineering (China), 14 2: 176-180. doi:10.1007/s12404-008-0036-y 85   Cited 2 times in Scopus2 0
Halatchev, R. A. and Knights, P. (2006). Geostatistical modelling of shovel performance using real-time monitoring data. In: Hood, Mike, Lever, Paul and Knights, Peter, 2006 Australian Mining Technology Conference:'Value through cost conrol". 2006 Australian Mining Technology Conference:'Value through cost control', Hunter Valley, NSW, Australia, (143-157). 26-27 September 2006. 76  
Costello, C. and Knights, P. (2013). Grizzly modifications at Ridgeway Deeps Block Cave Mine. In: Paul Hagan, Mining Education Australia Research Projects Review 2012. Mining Education Australia (MEA) Student Conference, Kalgoorlie, WA, Australia, (13-18). 12 October 2012. 61 2
Nel, S., Kizil, M. S. and Knights, P. (2011). Improving truck-shovel matching. In: Baafi, E. Y., Kinimonth, R. J. and Porter, I., Proceedings of the 35th APCOM Symposium. 35th APCOM Symposium, Wollongong, NSW, Australia, (381-391). 24-30 September 2011. 219 7698 Cited 1 times in Scopus1
Shafiee, Shahriar and Knights, Peter (2010). Incorporating econometric price models in real options valuation of mining projects. In: Bevan B. Beamish, Michael D. Barr and Andrew Denman, Proceedings of the 2010 Australian Mining Technology Conference: Technology changing the mining business footprint. 2010 Australian Mining Technology Conference, Perth, W.A., Australia, (93-109). 13-15 September 2010. 88 88
Little, J., Knights, P. and Topal, E. (2013) Integrated optimization of underground mine design and scheduling. Journal of the Southern African Institute of Mining and Metallurgy, 113 10: 775-785. 137 6 2 Cited 2 times in Scopus2
Nehring, M., Topal, E., Kizil, Mehmet S. and Knights, P. (2012) Integrated short- and medium-term underground mine production scheduling. Journal of The South African Institute of Mining and Metallurgy, 112 5: 365-378. 221 2 2 Cited 3 times in Scopus3
Li, Shuxing and Knights, Peter (2009) Integration of real options into short-term mine planning and production scheduling. Mining Science and Technology, 19 5: 674-678. doi:10.1016/S1674-5264(09)60125-3 140   Cited 6 times in Scopus6 0
Paterson, W. and Knights, P. (2013). Management of trailing cables on electrically powered load-haul-dump units. In: Paul Hagan, Mining Education Australia Research Projects Review 2012. Mining Education Australia (MEA) Student Conference, Kalgoorlie, WA, Australia, (67-74). 12 October 2012. 124 4
Knights, P. and Liang, L. (2011). Mine data analytics - New skills required for tomorrow's mines. In: Saydam, S., Second International Future Mining Conference. Second International Future Mining Conference, Sydney, Australia, (69-74). 22 - 23 November 2011. 88 2
Kumar, Uday, Knights, Peter and Kuruppu, Mahinda (2011). Mine infrastructure maintenance. In Peter Darling (Ed.), SME mining engineering handbook 3rd ed. (pp. 825-838) Colorado, USA: Society for Mining, Metallurgy, and Exploration. 98 2
Londono, J. G., Knights, P. F. and Kizil, M. S. (2013) Modelling of In-Pit Crusher Conveyor alternatives. Mining Technology - Transactions of the Institutions of Mining and Metallurgy : Section A, 122 4: 193-199. doi:10.1179/1743286313Y.0000000048 230 2 Cited 1 times in Scopus1 0
Knights, P. (2007). Optimal replacement intervals for Shovel Dipper Teeth. In: M. Hood, P. Knights and P. J. A. Lever, Smart Technologies for Overcoming the Skills Shortage. 2007 Australian Mining Technology Conference, The Vines, Western Australia, (163-172). 2-4 October, 2007. 135  
Knights, Peter (2009) Optimal Replacement Intervals For Shovel Dipper Teeth. International Journal of Mining Reclamation and Environment,, 23 3: 157-167. doi:10.1080/17480930902916221 187   0 Cited 2 times in Scopus2 0
Knights, P. F. and Paton, S. (2010). Payload variance effects on truck bunching. In: Bob Adams, Mark Adams and Allan Blair, Proceedings of the Seventh Large Open Pit Mining Conference 2010. Seventh Large Open Pit Mining Conference 2010, Perth, W.A., Australia, (111-114). 27-28 July 2010. 87 181
Adams, H., Boniwell, P. and Knights, P. (2008). Production drill optimisation at telfer underground - A move towards automation. In: Australasian Institute of Mining and Metallurgy, Tenth AusIMM Underground Operators' Conference. Tenth AusIMM Underground Operators' Conference, Tasmania, Australia, (37-40). 14-16 April 2008. 49   Cited 0 times in Scopus0

Page 1 of 2

Result Pages:    1 2  next › last »