Browse by all authors Browse By Author ID - Murthy, Pra

Browse Results (101 results found)

Subscribe to the RSS feed for this result setSubscribe to the RSS feed for this result set

Page 1 of 3

Result Pages:    1 2 3  next › last »

Refine

  Abstract Views File Downloads Thomson Reuters Web of Science Citation Count Scopus Citation Count Altmetric Score
Townson, P. and Murthy, D.N.P. (2007) A critical evaluation of Weibull Accelerated Failure Models. Quality Technology and Quantitative Management, 4 1: 35-50. 120  
Jack, N. and Murthy, D. N. P. (2007) A flexible extended warranty and related optimal strategies. Journal of The Operational Research Society, 58 12: 1612-1620. doi:10.1057/palgrave.jors.2602326 188   11 Cited 16 times in Scopus16 0
Lai, C. D., Xie, M. and Murthy, D. N. P. (2003) A modified Weibull distribution. Ieee Transactions On Reliability, 52 1: 33-37. doi:10.1109/TR.2002.805788 92   102 Cited 118 times in Scopus118 0
Jack, N. and Murthy, D. N. P. (2002) A new preventive maintenance strategy for items sold under warranty. IMA Journal of Management Mathematics, 13 121-129. doi:10.1093/imaman/13.2.121 51   Cited 5 times in Scopus5 0
Iskandar, B. P., Murthy, D. N. P. and Jack, N. (2005) A new repair-replace strategy for items sold with a two-dimensional warranty. Computers & Operations Research, 32 3: 669-682. doi:10.1016/j.cor.2003.08.011 51   39 Cited 48 times in Scopus48 0
Kobbacy, K. A. H. and Murthy, D. N. P. (2008). An overview. In K. A. N. Kobbacy and D. N. P. Murthy (Ed.), Complex System Maintenance Handbook (pp. 3-20) United Kingdom: Springer Verlag London Limited. doi:10.1007/978-1-84800-011-7 50   0
Jack, N, Iskandar, BP and Murthy, DNP (2009) A repair-replace strategy based on usage rate for items sold with a two-dimensional warranty. RELIABILITY ENGINEERING & SYSTEM SAFETY, 94 2: 611-617. doi:10.1016/j.ress.2008.06.019 88   26 Cited 36 times in Scopus36 0
Jack, N and Murthy, DNP (2001) A servicing strategy for items sold under warranty. Journal of The Operational Research Society, 52 11: 1284-1288. doi:10.1057/palgrave.jors.2601223 66   32 0
Jiang, R. and Murthy, D. N. P. (2011) A study of Weibull shape parameter: Properties and significance. Reliability Engineering and System Safety, 96 12: 1619-1626. doi:10.1016/j.ress.2011.09.003 159   7 Cited 8 times in Scopus8 0
Lai, C. D., Xie, M. and Murthy, D. N. P. (2001). Bathtub-Shaped Failure Rate Life Distributions. In N. Balakrishnan and C. R. Rao (Ed.), Handbook of Statistics Vol. 20 - Advances in Reliability 20 ed. (pp. 69-104) Netherlands: Elsevier Science B.V.. 152  
Murthy, D. N. Prabhakar, Blischke, Wallace, Kakouros, Steve and Kuettner, Dorothea (2007) Changing the Way We Think About Warranty Management. Warranty Week Newsletter, . 83  
Murthy, D. N. Prabhakar, Blischke, Wallace, Kakouros, Steve and Kuettner, Dorothea (2007) Changing the Way We Think About Warranty Management. Warranty Week Newsletter, . 59  
Jack, N, Murthy, DNP and Iskandar, BP (2003) Comments on "Maintenance policies with two-dimensional warranty". Reliability Engineering & System Safety, 82 1: 105-109. doi:10.1016/S0951-8320(03)00119-4 39   4 Cited 6 times in Scopus6 0
Murthy, D.N.P., Osteras, T and Rausand, M (2009) Component reliability specification. RELIABILITY ENGINEERING & SYSTEM SAFETY, 94 10: 1609-1617. doi:10.1016/j.ress.2009.02.029 52   3 Cited 6 times in Scopus6 0
Baik, J., Murthy, D. N. P. and Jack, N. (2006) Erratum: Two-Dimensional Failure Modeling with Minimal Repair which appeared in this journal of April 2004, Volume 51:3 on pages 345–362. Naval Research Logistics, 53 1: 115-116. doi:10.1002/nav.20115 59   7 Cited 2 times in Scopus2 0
Murthy, D. N. Prabhakar and Jack, Nat Extended warranties, maintenance service and lease contracts: modeling and analysis for decision-making. London, UK: Springer-Verlag, 2014. doi:10.1007/978-1-4471-6440-1 24 1 0 0
Jiang, R and Murthy, DNP (2009) Impact of quality variations on product reliability. RELIABILITY ENGINEERING & SYSTEM SAFETY, 94 2: 490-496. doi:10.1016/j.ress.2008.05.009 39   9 Cited 20 times in Scopus20 0
Blischke, W. R. and Murthy, D. N. P. (2003). Introduction and Overview. In Wallace R. Blischke and D. N. Prabhakar Murthy (Ed.), Case Studies in Reliability and Maintenance (pp. 1-34) New Jersey, USA: John Wiley and Sons, Inc. 47  
Murthy, DNP, Rausand, M and Virtanen, S (2009) Investment in new product reliability. RELIABILITY ENGINEERING & SYSTEM SAFETY, 94 10: 1593-1600. doi:10.1016/j.ress.2009.02.031 42   11 Cited 17 times in Scopus17 0
Murthy, D.N.P. and Jiang, R. Maintenance: Decision models for management. Edited by W. Zhixin and C. Jie Beijing, China: Science Press, 2008. 153  
Murthy, D. N. P. (2006). Maintenance of Complex Systems: Issues and Challenges. In A. K. Verma and P. K. Kapoor (Ed.), Quality, Reliability and Information Technology (pp. 10-19) New Delhi: Narosa Pub House. 33  
Pongpech, J. and Murthy, D.N.P. (2008). Maintenance of leased equipment. In Khairy A.H. Kobbacy and D.N.Prabhakar Murthy (Ed.), Complex System Maintenance Handbook (pp. 395-416) London, England: Springer. 38  
Murthy, D.N.P. and Jack, N. (2008). Maintenance outsourcing. In Khairy A.H. Kobbacy and D.N.Prabhakar Murthy (Ed.), Complex System Maintenance Handbook (pp. 373-394) London, England: Springer. 61  
Murthy, D. N. P., Jack, N. and Kumar, U. (2013). Maintenance outsourcing: issues and challenges. In T. Doshi and T. Nakagawa (Ed.), Stochastic reliability and maintenance modeling: essays in honor of Professor Shunji Osaki on his 70th birthday (pp. 41-62) London, United Kingdom: Springer Verlag. doi:10.1007/978-1-4471-4971-2_3 19 4 0
Murthy, D. N. P. (2000). Maintenance Service Contracts. In M. Ben-Daya, S.O. Duffuaa and A. Raouf (Ed.), Maintenance Modeling and Optimization (pp. 111-130) Netherlands: Kluwer Academic Publisher. 51  
Pongpech, J., Murthy, D. N. P. and Boondiskulchok, R. (2006) Maintenance Strategies for used equipment under lease. Journal of Quality in Maintenance Engineering, 12 1: 52-67. doi:10.1108/13552510610654538 86   Cited 23 times in Scopus23 0
Gurgenci, H., Guan, Z., Townson, P. and Murthy, D. N. P. (2000). Managing damage on draglines and other mining machines. In: After 2000 - The Future of Mining Annual Conference (AusIMM 2000). The Impact of New Technology and Changing Demands on the Mining Industry, Sydney, Australia, (96-101). 10-12 April, 2000. 109  
Bebbington, M., Lai, C. D., Murthy, D. N. P. and Zitikis, R. (2009) Modelling N- and W-shaped hazard rate functions without mixing distributions. Proceedings of the Institution of Mechanical Engineers, Part O: Journal of Risk and Reliability, 223 1: 59-69. doi:10.1243/1748006XJRR219 50   0 Cited 4 times in Scopus4 0
Jiang, R., Murthy, D.N.P. and Ji, P. (2001) Models involving two inverse Weibull distributions. Reliability Engineering & System Safety, 73 1: 73-81. doi:10.1016/S0951-8320(01)00030-8 84   28 Cited 32 times in Scopus32 0
Bellary, A. and Murthy, D. N. P. (1999). New product development process and total quality management. In: D. F. Kocaoglu and T. R. Anderson, PICMET '99: Portland International Conference on Management of Engineering and Technology: Proceedings Volume 2: Conference Presentations. PICMET '99: Portland International Conference on Management :, Portland, Oregon, (329-334). 25-29 July 1999. 140  
Murthy, D. N. P. and Djamaludin, I. (2002) New product warranty: A literature review. International Journal of Production Economics, 79 3: 231-260. doi:10.1016/S0925-5273(02)00153-6 63   104 Cited 144 times in Scopus144 0
Murthy, Pra (2010). New research in reliability, warranty and maintenance. In: Stefanka Chukova, John Haywood and Tadashi Dohi, Proceedings of the 4th Asia-Pacific International Symposium - Advanced reliability IV: Beyond the traditional reliability and maintainability approaches. 4th Asia-Pacific International Symposium on Advanced Reliability and Maintenance Modeling (APARM 2010), Wellington, New Zealand, (504-515). 2-4 December 2010. 99 1162
Jiang, R., Murthy, D. N. P. and Ji, P. (2001) n-fold Weibull multiplicative model. Reliability Engineering & System Safety, 74 2: 211-219. doi:10.1016/S0951-8320(01)00108-9 42   4 Cited 3 times in Scopus3 0
Huang, H., Xie, M. and Murthy, D. N. P. (1999). On the optimally switching of system components to spares. In: Richard J. Wilson, Shunji Osaki and M. J. Faddy, Proceedings of the First Western Pacific and Third Australia-Japan Workshop on Stochastic Models in Engineering, Technology and Management. , Christchurch, NZ, (147-153). 23-25 September 1999. 27  
Ye, Zhi-Sheng, Murthy, D. N. Pra, Xie, Min and Tang, Loon-Ching (2013) Optimal burn-in for repairable products sold with a two-dimensional warranty. IIE Transactions, 45 2: 164-176. doi:10.1080/0740817X.2012.677573 42   4 Cited 6 times in Scopus6 0
Moini, A. and Murthy, D. N. P. (2000) Optimal lot sizing with unreliable production system. Mathematical & Computer Modelling, 31 10-12: 245-250. doi:10.1016/S0895-7177(00)00093-5 41   6 Cited 10 times in Scopus10 0
Pongpech, J. and Murthy, D. N. P. (2006) Optimal periodic preventive maintenance policy for leased equipment. Reliability Engineering & System Safety, 91 7: 772-777. doi:10.1016/j.ress.2005.07.005 47   30 Cited 40 times in Scopus40 0
Jaturonnatee, J., Murthy, D. N. P. and Boondiskulchok, R. (2006) Optimal preventive maintenance of leased equipment with corrective minimal repairs. European Journal Of Operational Research, 174 1: 201-215. doi:10.1016/j.ejor.2005.01.049 78   25 Cited 31 times in Scopus31 1
Chattopadhyay, G. and Murthy, D.N.P. (2004) Optimal reliability improvement for used items sold with warranty. International Journal of Reliability and Applications, 5 2: 47-58. 393  
Huang, H.Z., Liu, Z.J. and Murthy, DNP (2007) Optimal reliability, warranty and price for new products. Iie Transactions, 39 8: 819-827. doi:10.1080/07408170601091907 154   84 Cited 100 times in Scopus100 0
Townson, P., Murthy, D.N.P. and Gurgenci, H. (2003). Optimization of Dragline Load. In Wallace R. Blischke and D.N. Prabhakar Murthy (Ed.), Case Studies in Reliability and Maintenance (pp. 517-544) New Jersey, USA and Canda: John Wiley and Sons, Inc. 89  
Osteras, T., Murthy, D. N. P. and Rausand, M. (2006) Product performance and specification in new product development. Journal of Engineering Design, 17 2: 177-192. doi:10.1080/09544820500275735 83   13 Cited 17 times in Scopus17 0
Saroso, D.S. and Murthy, D. N. P. (2007) Product quality improvement. International Journal of Technology Management, 37 1-2: 29-49. doi:10.1504/IJTM.2007.011802 118   0 Cited 0 times in Scopus0 0
Murthy, D. N. P. (2007) Product reliability and warranty: an overview and future research. Producao, 17 3: 426-434. doi:10.1590/S0103-65132007000300003 53   Cited 1 times in Scopus1 0
Murthy, D.N.P. (2007). Product reliability: A product life cycle perspective. In: Dohi, T., Osaki, S. and Sawaki, K., Proceedings of International Workshop on Recent Advances in Stochastic Operations Research II. Proceedings of International Workshop on Recent Advances in Stochastic Operations Research II, Nagoya, Japan, (163-170). 5-6 March 2007. 87  
Murthy, D.N.P., Rausand, M. and Osteras, T. Product Reliability - Specification and Performance. Edited by Pham, H. United Kingdom: Springer -Verlag, 2008. 51  
Murthy, D.N.P., Hagmark, PE and Virtanen, S (2009) Product variety and reliability. RELIABILITY ENGINEERING & SYSTEM SAFETY, 94 10: 1601-1608. doi:10.1016/j.ress.2009.02.030 70   4 Cited 8 times in Scopus8 0
Murthy, D. N. P. (1999). Product warranty and mathematical modelling. In: ICIAM99: The Fourth International Congress on Industrial and Applied Mathematics: Book of Abstracts. ICIAM99: The Fourth International Congress on Industrial and Applied Mathematics, Edinburgh, Scotland, (189). 5-9 July 1999. 49  
Murthy, D. N. P. (2006). Product warranty and reliability. In: Peter L. Hammer, International Conference of OR for Development, Chennai, India, (133-146). 27–30 December 2002. doi:10.1007/s10479-006-7377-y 86   13 Cited 22 times in Scopus22 0
Murthy, D. N. P., Solem, O. and Roren, T. (2004) Product warranty logistics: Issues and challenges. European Journal of Operational Research, 156 1: 110-126. doi:10.1016/S0377-2217(02)00912-8 103   43 Cited 55 times in Scopus55 0

Page 1 of 3

Result Pages:    1 2 3  next › last »