Browse by all authors Browse By Author ID - Dimitrakopoulos, Roussos

Browse Results (36 results found)

Subscribe to the RSS feed for this result setSubscribe to the RSS feed for this result set

Refine

  Abstract Views File Downloads Thomson Reuters Web of Science Citation Count Scopus Citation Count Altmetric Score
Godoy, M. and Dimitrakopoulos, R. (2004). A multi-stage approach to profitable risk management for strategic planning in open pit mines. In: Orebody Modelling and Strategic Mine Planning -- Uncertainty and Risk Management International Symposium 2004. Orebody Modelling and Strategic Mine Planning -- Uncertainty and Risk Management International Symposium 2004, Perth, (339-345). 22-24 November 2004. 235  
Boucher, A. and Dimitrakopoulos, R. (2004). A new efficient joint simulation framework and application in a multivariable deposit. In: Orebody Modelling and Strategic Mine Planning -- Uncertainty and Risk Management International Symposium 2004. Orebody Modelling and Strategic Mine Planning -- Uncertainty and Risk Management International Symposium 2004, Perth, (303-312). 22-24 November 2004. 80  
Dimitrakopoulos, R. and Fonseca, M. (2003). Assessing Risk in Grade-Tonnage Curves in a Complex Copper Deposit, Northern Brazil, Based on an Efficient Joint Simulation of Multiple Correlated Variables. In: F. A. Camisani-Calzolari, Symposium Series S31, 31st International Symposium on Application of Computers and Operations Research in the Minerals Industries. 31st International Symposium on Application of Computers and s, Cape Town, South Africa, (373-382). 14 - 16 May, 2003. 82  
Vargas-Guzman, JA and Dimitrakopoulos, R (2003) Computational properties of min/max autocorrelation factors. Computers & Geosciences, 29 6: 715-723. doi:10.1016/S0098-3004(03)00036-0 61   11 Cited 14 times in Scopus14 0
Jewbali, A. and Dimitrakopoulos, R. (2004). Conditional simulation by successive residuals: Updating of existing orebody realisations. In: Orebody Modelling and Strategic Mine Planning -- Uncertainty and Risk Management International Symposium 2004. Orebody Modelling and Strategic Mine Planning, Perth, (121-127). 22-24 November 2004. 63  
Dimitrakopoulos, R. and Li, S. (2000). Conditional simulation of faults and uncertainty assessment in longwall coal mining. In: W J Kleingeld and D G Krige, 6th International Geostatistics Congress Proceedings. 6th International Geostatistics Congress, Cape Town, South Africa, (1-12). 10-14, April, 2000. 66  
Vargas-Guzman, JA and Dimitrakopoulos, R (2002) Conditional simulation of random fields by successive residuals. Mathematical Geology, 34 5: 597-611. doi:10.1023/A:1016099029432 82   10 Cited 12 times in Scopus12 0
Luo, X and Dimitrakopoulos, R (2003) Data-driven fuzzy analysis in quantitative mineral resource assessment. Computers & Geosciences, 29 1: 3-13. doi:10.1016/S0098-3004(02)00078-X 223   30 Cited 44 times in Scopus44 0
Cheuiche Godoy, M., Dimitrakopoulos, R. and Costa, J. F. (2001). Economic Functions and Geostatistical Simulation Applied to Grade Control. In A. C. Edwards (Ed.), Mineral Resource and Ore Reserve Estimation -- The AusIMM Guide to Good Practice (pp. 591-599) Australia: The Australasian Institute of Mining and Metallurgy. 103  
Richmond, A. J. and Dimitrakopoulos, R. (2000). Evolution of a simulation: implications for implementation. In: W J Kleingeld and D G Krige, 6th International Geostatistics Congress Proceedings. 6th International Geostatistics Congress, Cape Town, South Africa, (1-11). 10-14 April 2000. 43  
Scott, J. R., Dimitrakopoulos, R., Li, S. and Bartlett, K. (2004). Fractal-based fault simulation using a geological analogue: Quantification of fault risk at Wyong, NSW, Australia. In: Orebody Modelling and Strategic Mine Planning -- Uncertainty and Risk Management International Symposium 2004. Orebody Modelling and Strategic Mine Planning -- Uncertainty and Risk Management International Symposium 2004, Perth, (137-143). 22-24 November 2004. 127  
Desbarats, A. J. and Dimitrakopoulos, R. (2000) Geostatistical Simulation of Regionalized Pore-Size Distributions Using Min/Max Autocorrelation Factors. Mathematical Geology, 32 8: 919-942. doi:10.1023/A:1007570402430 68   36 Cited 39 times in Scopus39 0
Grieco, N. and Dimitrakopoulos, R. (2004). Grade uncertainty in stope design: improving the optimisation process. In: Orebody Modelling and Strategic Mine Planning -- Uncertainty and Risk Management International Symposium 2004. Orebody Modelling and Strategic Mine Planning -- Uncertainty and Risk Management International Symposium 2004, Perth, (249-256). 22-24 November 2004. 116  
Dimitrakopoulos, R., Farrelly, C. T. and Godoy Cheuiche , M. (2001). I'd rather be approximately right than precisely wrong: Grade uncertainty, risk effects and decision making in open pit design. In: Strategic Mine Planning 2001. Strategic Mine Planning 2001, Perth, Australia, (35-41). 26-28 March 2001. 236  
Kay, Matthew and Dimitrakopoulos, Roussos (2000) Integrated Interpolation Methods for Geophysical Data: Applications to Mineral Exploration. Natural Resources Research, 9 1: 53-63. doi:10.1023/A:1010161813931 103   0
Li, S. and Dimitrakopoulos, R. (2001). Integrating fault uncertainty into longwall design and planning. In: Heping Xie, Yuehan Wang and Yaodong Jiang, Computer Applications in the Mineral Industries. The 29th International Symposium on Computer Applications in the Minerals Industries, Beijing, China, (239-244). 25-27 April 2001. 62  
Li, Shuxing and Dimitrakopoulos, Roussos (2001). Integrating fault uncertainty into longwall design and planning. In: Heping Xie, Yuehan Wang and Yaodong Jiang, Proceedings of the 29th International Symposium on Computer Applications in the Minerals Industries. 29th International Symposium on Computer Applications in the Minerals Industries (APCOM’2001), Beijing, China, (239-244). 25-27 April 2001. 79 6 0 Cited 0 times in Scopus0
Dimitrakopoulos, R. and Kaklis, K. (2001) Integration of assay and cross-hole tomographic data in orebody modelling: joint geostatistical simulation and application at Mount Isa mine, Australia. Section B: Applied Earth Science, Transactions of the institution of mining and metallurgy, 110 January-April: 33-39. 54  
Dimitrakopoulos, R., Farrelly, C. T. and Cheuiche Godoy, M. (2002) Moving forward from traditional optimization: Grade uncertainty and risk effects in open-pit design. Transactions of the Institution of Mining and Metallurgy, III A82-A88. 79   19 Cited 46 times in Scopus46
Benndorf, J. and Dimitrakopoulos, R. (2004). New efficient methods for conditional simulation of large orebodies. In: Orebody Modelling and Strategic Mine Planning -- Uncertainty and Risk Management International Symposium 2004. Orebody Modelling and Strategic Mine Planning -- Uncertainty and Risk Management International Symposium 2004, Perth, (103-109). 22-24 November 2004. 243  
Halatchev, Rossen and Dimitrakopoulos, Roussos (2003) On the dynamics of mining operations in open pit mines. International Journal of Surface Mining, Reclamation and the Environment, 17 4: 246-263. doi:10.1076/ijsm.17.4.246.17482 55 10 Cited 1 times in Scopus1 0
Halatchev, R. A. and Dimitrakopoulos, R. (2003) On the Dynamics of Mining Operations in Open Pit Mines. International Journal of Surface Mining, Reclamation and Environment, 17 4: 246-263. 88   Cited 1 times in Scopus1
Li, S. and Dimitrakopoulos, R. (2002) Quantification and assessment of fault uncertainty and risk using stochastic conditional simulations. Journal of Coal Science and Engineering, 8 2: 1-11. 45 418
Dimitrakopoulos, R. and Li, S. (2001). Quantification of fault uncertainty and risk management in longwall coal mining: back-analysis study at North Goonyella mine, Queensland. In: Geological harzards. Geological Hazards, Lake Macquarie, Australia, (175-182). 15-16 November 2001. 140  
Li, S., Dimitrakopoulos, R. and Scott, J. R. (1999). Quantification of fault uncertainty in longwall coal mining based on stochastic simulation. In: C. Dardano, M. Francisco and J. Proud, Proceedings of APCOM'99. Computer applications in the minerals industries. APCOM'99. Computer applications in the mineral industries, Colorado Sch. of Mines, Golden, Colorado, USA, (197-204). 20-22 October 1999. 56  
Li, S., Dimitrakopoulos, R., Scott, J. R. and Dunn, D. (2004). Quantification of geological uncertainty and risk using stochastic simulation and applications in the coal mining industry. In: Orebody Modelling and Strategic Mine Planning -- Uncertainty and Risk Management International Symposium 2004. Orebody Modelling and Strategic Mine Planning -- Uncertainty and Risk Management International Symposium 2004, Perth, (185-192). 22-24 November 2004. 269 1978
Dimitrakopoulos, R. and Scott, M. (2001) Quantitative analysis of Mineral Resources for strategic planning: Implications for Australian Geological Surveys. Natural Resources Research, 10 3: 159-177. 70  
Farrelly, Chris T. and Dimitrakopoulos, Roussos (2002) Recoverable reserves and support effects when optimizing open pit mine designs. International Journal of Surface Mining, Reclamation and Environment, 16 3: 217-229. doi:10.1076/ijsm.16.3.217.7424 44   Cited 3 times in Scopus3 0
Ramazan, S. and Dimitrakopoulos, R. (2004). Stochastic optimisation of long-term production scheduling for open pit mines with a new integer programming formulation. In: Orebody Modelling and Strategic Mine Planning -- Uncertainty and Risk Management International Symposium 2004. Orebody Modelling and Strategic Mine Planning -- Uncertainty and Risk Management International Symposium 2004, Perth, (353-359). 22-24 November 2004. 77  
Li, Shuxing and Dimitrakopoulos, Roussos (2005). Stochastic Simulation-based Risk Assessment for Drilling Optimisation. In: Application of computers and operations research in the mineral industry : proceedings of the 32nd International Symposium on the Application of Computers and Operations Research in the Mineral Industry (APCOM 2005). 32nd International Symposium on the Application of Computers and Operations Research in the Mineral Industry (APCOM 2005), Tucson, USA, (475-478). 30 March - 1 April 2005. 107 9
Dimitrakopoulos, R. and Mackie, S. M. (2003). Stochastic simulation for the quantification of mine spoil variability and rehabilitation decision making. In: D. A. Post, Proceedings of the International Congress on Modelling and Simulation. MODSIM 2003 International Congress on Modelling and Simulation, Townsville, Queensland, (1703-1708). 14-17 July 2003. 54  
Vargas-Guzman, J. A. and Dimitrakopoulos, R. (2003) Successive nonparametric estimation of conditional distributions. Mathematical Geology, 35 1: 39-52. doi:10.1023/A:1022361028297 48   7 Cited 11 times in Scopus11 0
Farrelly, C. T. and Dimitrakopoulos, R. (1999). Support effects when optimising with Whittle four-D, Wirralie gold deposit ,North Queensland. In: Proceedings of Optimizing with Whittle 1999. Third Biennial Conference. Strategic Mine Planning, Hyatt Regency Hotel, Perth, (51-59). 23-24 March 1999. 73  
Dimitrakopoulos, R. and Richardson, K. W. (2000). Sustainable mineral development and environmental conservation: A framework for decision-making. In: Singhal and Mehrotra, Environmental Issues and Management of Waste in Energy and Mineral Production. Environmental Issues and Management of Waste in Energy and Mineral Production, Calgary, canada, (29-34). 9-6, June, 2000. 67  
Smith, M. L. and Dimitrakopoulos, R. (1999) The influence of deposit uncertainty on mine production scheduling. International Journal of Surface Mining, Reclamation and Environment, 13 4: 173-178. doi:10.1080/09208119908944244 111   0
Scott, M., Dimitrakopoulos, R. and Brown, R. P. (2002) Valuing regional geoscientific data acquisition programmes: Addressing issues of quantification, uncertainty and risk. Natural Resources Forum, 26 1: 55-68. 75   Cited 3 times in Scopus3