Shafiee, S., Topal, E. and Nehring, M. (2009). Adjusted real option valuation to maximise mining project value – A case study using century mine. In: Project Evaluation 2009 [electronic resource] : proceedings : "moving forward in challenging times". Project Evaluation Conference 2009, Melbourne, Australia, (125-134). 21-22 April 2009. 424  
Topal, E. and Sens, J. (2010) A new algorithm for stope boundary optimization. Journal of Coal Science and Engineering, 16 2: 113-119. doi:10.1007/s12404-010-0201-y 23   Cited 5 times in Scopus5 0
Nehring, M., Topal, E. and Little, J. (2010) A new mathematical programming model for production schedule optimization in underground mining operations. Journal of the South African Institute of Mining and Metallurgy, 110 8: 437-446. 249 2 2 Cited 4 times in Scopus4
Little, J., Nehring, M. and Topal, E. (2008). A new mixed-integer programming model for mine production scheduling optimisation in sublevel stope mining. In: P. Knights and P. J. A. Lever, Proceedings of: 2008 Australian Mining Techology Conference. 2008 Australian Mining Techology Conference, Twin Waters, Sunshine Coast, QLD, (167-172). 16-18 September, 2008. 179  
Micah Nehring and Topal, E. (2009). A New Short-Term Production Scheduling and Machine Allocation Model Using Mixed Interger Programming for Application in Sublevel Stope Mining Operations. In: Peter Knights and Paul J.A. Lever, Proceedings of the 2009 Australian Mining Technology Conference. 2009 Australian Mining Technology Conference, Brisbane, Australia, (116-133). 27-28 October 2009. 119  
Nehring, M., Topal, E., Kizil, M. and Knights, P. (2010). An investigation to integrate optimum long-term planning with short planning in underground mine production scheduling. In: P. A. Dowd, Mine Planning and Equipment Selection – MPES 2010 Proceedings. MPES2010: Mine Planning and Equipment Selection, Freemantle, Western Australia, (141-153). 1-3 December, 2010. 146 13
Shafiee, S. and Topal, E. (2008). An overview of fossil fuel reserve depletion time. In: International Conference: Bridging Energy Supply and Demand: Logistics, Competition and Environment. 31st IAEE International Conference, Istanbul, Turkey, (315-316). 18-20 June, 2008. 135  
Shafiee, S. and Topal, E. (2008). Applied real option valuation in a conceptual mining project. In: P. Knights and P. J. A. Lever, Proceedings of: 2008 Australian Mining Techology Conference. 2008 Australian Mining Techology Conference, Twin Waters, Sunshine Coast, QLD, (173-187). 16-18 September, 2008. 274  
Williams, D.J., Topal, E., Zhang, N. and Scott, P.A. (2008). Development of a rock dump scheduling model using linear programming. In: Fourie, A., Proceedings of the First International Seminar on the Management of Rock Dumps, Stockpiles and Heap Leach Pads. Rock Dumps 2008, Perth, Western Australia, (129-137). 5-6 March 2008. 121  
Dight, P. M., Douglas, B., Henley, K., Lumley, G., McAree, P. R., Miller, D., Saydam, S., Topal, E., Wesseloo, J. and Williams, D. J. (2013). Developments in open cut mining. In W. J. Rankin (Ed.), Australasian mining and metallurgical operating practices 3rd ed. (pp. 47-80) Carlton, VIC, Australia: Australasian Institute of Mining and Metallurgy. 83 6
Nehring, M., Topal, E. and Knights, P. (2010) Dynamic Short term production scheduling and machine allocation in underground mining using mathematical programming. Transactions of the Institute of Materials, Minerals and Mining, Section A: Mining Technology, 119 4: 212-220. doi:10.1179/1743286310Y.0000000001 156 7 Cited 4 times in Scopus4 0
Topal, E. (2008) Early start and late start algorithms to improve the solution time for long-term underground mine production scheduling. South African Institute of Mining and Metallurgy, 108 2: 101-107. 107   1 Cited 19 times in Scopus19
Shafiee, S. and Topal, E. (2007). Econometric forecasting of energy coal prices. In: M. Hood, P. Knights and P. J. A. Lever, Proceedings of: the 2007 Australian Mining Technology Conference. 2007 Australian Mining Technology Conference, The Vines, Western Australia, (173-179). 2-4 October 2007. 116  
Shafiee, S., Nehring, M. and Topal, E. (2009). Estimating average total cost of open pit coal mines in Australia. In: Peter Knights and Paul Lever, Technology solutions for challenging financial times. 2009 Australian Mining Technology Conference, Brisbane QLD, (134-146). 27 - 28 October 2009. 251  
Topal, E. (2008) Evaluation of a mining project using discounted cash flow analysis, decision tree analysis, Monte Carlo simulations and real options using an example. International Journal of Mining and Mineral Engineering, 1 1: 62-76. 343  
Ayhan, M and Topal, E (2005) Excavation and support design of the Dicle-Kralkizi water tunnel: an overview. Tunnelling And Underground Space Technology, 20 1: 81-87. doi:10.1016/j.tust.2004.06.001 108   1 Cited 3 times in Scopus3 0
Kuchta, M, Newman, A and Topal, E (2004) Implementing a production schedule at LKAB's Kiruna Mine. Interfaces, 34 2: 124-134. doi:10.1287/inte.1030.0059 91   15 Cited 22 times in Scopus22 0
Little, J., Knights, P. and Topal, E. (2013) Integrated optimization of underground mine design and scheduling. Journal of the Southern African Institute of Mining and Metallurgy, 113 10: 775-785. 119 6 1 Cited 2 times in Scopus2
Nehring, M., Topal, E., Kizil, Mehmet S. and Knights, P. (2012) Integrated short- and medium-term underground mine production scheduling. Journal of The South African Institute of Mining and Metallurgy, 112 5: 365-378. 205 2 2 Cited 2 times in Scopus2
Shafiee, S. and Topal, E. (2008). Introducing a new model to forecast mineral commodity price. In: Saydam, S., First International Future Mining Conference & Exhibition 2008. First International Future Mining Conference & Exhibition 2008, Sydney Australia, (243-250). 19-21 November 2008. 178  
Topal, E. and Williams, D. J. (2013). Mine waste rock management. In W. J. Rankin (Ed.), Australasian mining and metallurgical operating practices 3rd ed. (pp. 76-77) Carlton, VIC, Australia: Australasian Institute of Mining and Metallurgy. 84 10
Nehring, M. and Topal, E. (2007). Mixed integer programming model for mine production scheduling of sublevel stoping operation. In: M. Hood, P. Knights and P. J. A. Lever, Proceedings of the 2007 Australian Mining Technology Conference. 2007 Australian Mining Technology Conference, The Vines, Western Australia, (136-149). 2-4 October 2007. 153  
Nehring, M. and Topal, E. (2007). Mixed integer programming model for mine production scheduling of sub-level stoping operations. In: Smart technologies for overcoming the skills shortage. 2007 Australian Mining Technology Conference, The Vines, Australia, (). 2th - 4th October, 2007. 89  
Topal, E and Ayhan, M (2005) New linear programming optimisation model for marble factory production. Industrial Diamond Review, 2: 19-+. 137   0 Cited 1 times in Scopus1
Nehring, M. and Topal, E. (2007). Production schedule optimisation in underground hard rock mining using mixed integer programming. In: Project Evaluation Conference 2007. Project Evaluation Conference 2007, Melbourne, Victoria, (169-175). 19-20 June 2007. 272   3 Cited 2 times in Scopus2
Kutcha, M., Newman, A. and Topal, E. (2003) Production scheduling at LKAB's Kiruna Mine using mixed-integer programming. Mining Engineering, 55 4: 35-40. 103   Cited 9 times in Scopus9
Little, J., Topal, E. and Knights, P. (2011) Simultaneous optimisation of stope layouts and long term production schedules. Transactions of the Institutions of Mining and Metallurgy, Section A: Mining Technology, 120 3: 129-136. doi:10.1179/1743286311Y.0000000011 19   Cited 0 times in Scopus0 0